The young London-Moscow-Tbilisi-based practice Architects of Invention has designed office building in the centre of Moscow which is due by the end of this year.
Multifunctional Office Building with underground car park is located at B.Pioneerskaya str. 1/17 in the Central District of Moscow. The plot design is limited by Zatsepa streets to the North, Big and Little Pioneerskaya streets from the East and the West and Stremianni lane from the South. The total site area is approximately 0.5 hectares.
The composition of the building is solved with the help of two connected volumes - a 14-storey office building of the rectangular form and a 7-storey building of the hotel. Also the complex includes 2-story historic building. Main entrance to the building is located from the Zacepa street underlined truncation at the level of the first and second floors. To reduce the visual scale of the building volumes further dissected dark line on the second, as well as the 12th floors.
Facade finish of the building is designed as continuous structural glazing with fritted pattern. Pattern is made of white - simulation of digital rain on the surface of the building. The density of drawing increases with height. This solution gives the facade solid appearance, protects from the sun and overheating the interior spaces in the summer.
Colour defines the function: white colour defines public space, while yellow highlights technical facilities, and clear glass - the public areas and entrances. Yellow bar at the 8th floor gives the building extraordinary, modern look and becomes easily - recognisable feature of the architecture of the complex.
Project Name: Office Building
The Client: Insigma Development
Architecture: Architects of Invention
Team: Michael Eichner, Davit Canava, Magdalini Giannakidi, Petras Isora, Nikoloz Japaridze, Anton Khmelnitskiy, Ivane Ksnelashvili, Daniel Lareau, Moritz Reinisch, Nikita Tsymbal
Design participation: Full Design Control RIBA STAGES - A- K
Interior Design: Architects of Invention
Landscape Design: Architects of Invention
Structural Engineer: MB Project
Finish Exterior: Shueco Glass Systems
Constructional engineer: MB Project
Main Contractors: MB Project
Supervision: Architects of Invention
Electrical Engineer: MB Project
Contractors: MB Project
Photographs: Courtesy of Architects of Invention
Function: Office Building
Programme: Lobby, Service Hall, Offices, Hotel, Restaurant
Construction period: Start 01 April 2013 – Completion due 30 Dec 2014
Site area: 1225 ㎡
Building area: 37,000 ㎡
Area: NET 150,0 ㎡, GEA - 2075㎡
Budget: $60mil ($1600/m2)
Stories: 14
↧