Quantcast
Channel: competitionline Projects
Viewing all articles
Browse latest Browse all 5494

Office Building

$
0
0
The young London-Moscow-Tbilisi-based practice Architects of Invention has designed office building in the centre of Moscow which is due by the end of this year. Multifunctional Office Building with underground car park is located at B.Pioneerskaya str. 1/17 in the Central District of Moscow. The plot design is limited by Zatsepa streets to the North, Big and Little Pioneerskaya streets from the East and the West and Stremianni lane from the South. The total site area is approximately 0.5 hectares. The composition of the building is solved with the help of two connected volumes - a 14-storey office building of the rectangular form and a 7-storey building of the hotel. Also the complex includes 2-story historic building. Main entrance to the building is located from the Zacepa street underlined truncation at the level of the first and second floors. To reduce the visual scale of the building volumes further dissected dark line on the second, as well as the 12th floors. Facade finish of the building is designed as continuous structural glazing with fritted pattern. Pattern is made of white - simulation of digital rain on the surface of the building. The density of drawing increases with height. This solution gives the facade solid appearance, protects from the sun and overheating the interior spaces in the summer. Colour defines the function: white colour defines public space, while yellow highlights technical facilities, and clear glass - the public areas and entrances. Yellow bar at the 8th floor gives the building extraordinary, modern look and becomes easily - recognisable feature of the architecture of the complex. Project Name: Office Building The Client: Insigma Development Architecture: Architects of Invention Team: Michael Eichner, Davit Canava, Magdalini Giannakidi, Petras Isora, Nikoloz Japaridze, Anton Khmelnitskiy, Ivane Ksnelashvili, Daniel Lareau, Moritz Reinisch, Nikita Tsymbal Design participation: Full Design Control RIBA STAGES - A- K Interior Design: Architects of Invention Landscape Design: Architects of Invention Structural Engineer: MB Project Finish Exterior: Shueco Glass Systems Constructional engineer: MB Project Main Contractors: MB Project Supervision: Architects of Invention Electrical Engineer: MB Project Contractors: MB Project Photographs: Courtesy of Architects of Invention Function: Office Building Programme: Lobby, Service Hall, Offices, Hotel, Restaurant Construction period: Start 01 April 2013 – Completion due 30 Dec 2014 Site area: 1225 ㎡ Building area: 37,000 ㎡ Area: NET 150,0 ㎡, GEA - 2075㎡ Budget: $60mil ($1600/m2) Stories: 14

Viewing all articles
Browse latest Browse all 5494