Quantcast
Channel: competitionline Projects
Viewing all articles
Browse latest Browse all 5494

Coca-Cola Beatbox

$
0
0
The Beatbox Pavilion was designed for Coca-Cola as their temporary showcasing venue for the London 2012 Summer Olympic Games. The Coca-Cola Beatbox is an experimental fusion of architecture, sport, music and technology that creates a multi-sensory experience. The visionary pavilion has been inspired by Coca-Cola’s global campaign for London 2012, Move to the Beat, that aims to connect young people to the Games by bringing together their passion for music and sport. Using the strength of the Coca-Cola brand the pavilion uses a faceted but instantly recognisable building envelope made up of over 200 red and white interlocking ETFE cushions. Innovative sound technology is embedded within the ETFE cushions creating an interactive sound journey and piece of architecture that the visitor can play like a musical instrument. The sound bytes include five Olympic sports recorded for Coca-Cola Olympic anthem ‘Anywhere in the World’ by British producer Mark Ronson. The recordings, which include athletes’ heartbeats, shoes squeaking, and arrows hitting a target can be triggered and remixed by the gestures and movements of the visitors as they make the 200m journey up the ramp to the pavilion’s rooftop. At roof level visitors enjoy a stunning panoramic view of the Olympic Park before descending an internally spiraling ramp into a darkened performance space featuring an interactive light installation. Project Architect: Asif Khan and Pernilla Ohrstedt Client: Coca-Cola Structural Engineers: AKT II Service Engineers: Atelier 10 Main Contractor: Nussli ETFE Contractor: Taiyo Europe Sound Programmer: Arthur Carabott Photography: Nick Hufton, Hufton & Crow Location: London 2012 Olympic Park, Stratford, London Use: Coca-Cola Showcase Pavilion Site Area: 1000sqm Building Area: 1000sqm Internal Ground Floor 110 sqm Exhibiton Space Back of House Area 90sqm Roof Terrace 185sqm Internal and external ramps are 200m long and 2m wide Structure: Steel Exterior Finish: Polished stainless steel cladding, black stained rough sawn larch boards and red and white ETFE Garland Interior Finish: Matt black painted plasterboard walls, ceilings and matt black rough sawn larch floors Design Period: 8 months Construction Period: 4months

Viewing all articles
Browse latest Browse all 5494